reclamation. It must be borne in mind that the cost of Building Sea Wall in 25 feet of water must necessarily be very much in excess of the Cost of building such Wall hitherto constructed by the Tenants. The Wall between Centre Street and M Lot 186 has not been injured owing to the Foreshore which protects it but opposite M. Lot 185 it is entirely washed away and in the event of another fall the gas works which adjoin will be liable to injury.

While this wall was being constructed the Tenant was continually warned that the work was very bad and on its completion I refused to grant a Certificate as to its being properly completed.

The cost of Praya Wall we would be about $200. The Wall of the N.W. Point which is uninjured was completed at the North end the Wall which was completed for a length of 400 feet is so injured

Edit History

2026-05-19 21:37:16 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
reclamation. It must be borne in mind that the cost of Building Sea Wall in 25 feet of water must necessarily be very much in excess of the Cost of building such Wall hitherto constructed by the Tenants. The Wall between Centre Street and M Lot 186 has not been injured owing to the Foreshore which protects it but opposite M. Lot 185 it is entirely washed away and in the event of another fall the gas works which adjoin will be liable to injury. While this wall was being constructed the Tenant was continually warned that the work was very bad and on its completion I refused to grant a Certificate as to its being properly completed. The cost of Praya Wall we would be about $200. The Wall of the N.W. Point which is uninjured was completed at the North end the Wall which was completed for a length of 400 feet is so injured
Baseline (Original)
reclamation. It must. be borne in mind that the cost of Building Sea Wall in 25 feet of water must necessarily very of the Cost of building be such 00 much in excess Wall ترک that hitherto constructed by the Tenants. The Wall. between Centre Street and M Lot 186 has not been injured orring to the Foreshore which protects it but opposite M. Lot 185 it is entirely washed away and in the event of another fale » گریم the gas works which 345 adjoin will be liable to while this wall injury. Avax being constructed the Tenant, was continually warned that the work Avas very bad and on it's completion I refused to grant a Certificate as to its being properly completed. The cost of Well we would be about $200 Powloon Sea Wall The Wall of the 3.W. Point which is uninjured, AVAA Prens completed at the Forth end the Wall which was completed for a length of 400 feet is so injured |
2026-05-19 21:37:16 · Baseline
View content

reclamation. It must.

be borne in mind that

the cost of Building Sea Wall in 25 feet of

water must necessarily

very

of the Cost of building

be

such

00

much in excess

Wall

ترک

that

hitherto constructed by

the Tenants. The Wall.

between Centre Street

and M Lot 186 has

not been injured orring to the Foreshore which

protects it but opposite

M. Lot 185 it is entirely

washed

away

and in

the event of another fale

»

گریم

the gas works which

345

adjoin will be liable to

while this wall

injury.

Avax

being constructed the Tenant, was continually

warned that the work

Avas

very

bad and on

it's completion I refused

to grant a Certificate as to its being properly

completed.

The cost of

Well we would be about $200

Powloon Sea Wall

The Wall of the 3.W.

Point which

is uninjured,

AVAA

Prens

completed

at the

Forth end the Wall which

was completed for a length

of 400 feet is so injured |

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.