reclamation. It must be borne in mind that the cost of Building Sea Wall in 25 feet of water must necessarily be very much in excess of the Cost of building such Wall hitherto constructed by the Tenants. The Wall between Centre Street and M Lot 186 has not been injured owing to the Foreshore which protects it but opposite M. Lot 185 it is entirely washed away and in the event of another fall the gas works which adjoin will be liable to injury.
While this wall was being constructed the Tenant was continually warned that the work was very bad and on its completion I refused to grant a Certificate as to its being properly completed.
The cost of Praya Wall we would be about $200. The Wall of the N.W. Point which is uninjured was completed at the North end the Wall which was completed for a length of 400 feet is so injured
reclamation. It must.
be borne in mind that
the cost of Building Sea Wall in 25 feet of
water must necessarily
very
of the Cost of building
be
such
00
much in excess
Wall
ترک
that
hitherto constructed by
the Tenants. The Wall.
between Centre Street
and M Lot 186 has
not been injured orring to the Foreshore which
protects it but opposite
M. Lot 185 it is entirely
washed
away
and in
the event of another fale
»
گریم
the gas works which
345
adjoin will be liable to
while this wall
injury.
Avax
being constructed the Tenant, was continually
warned that the work
Avas
very
bad and on
it's completion I refused
to grant a Certificate as to its being properly
completed.
The cost of
Well we would be about $200
Powloon Sea Wall
The Wall of the 3.W.
Point which
is uninjured,
AVAA
Prens
completed
at the
Forth end the Wall which
was completed for a length
of 400 feet is so injured |